Installation Of New Fire System M&S Waterloo Station

Installation Of New Fire System M&S Waterloo Station

M&S Food exterior in Waterloo Station.
Trades
Sprinkler Engineers
Sprinkler Engineers
Sprinkler Engineers
PAVA Engineers
PAVA Engineers
PAVA Engineers
Fire System Engineers
Fire System Engineers
Fire System Engineers
Damper Engineers
Damper Engineers
Damper Engineers
Dry Riser Specialists
Dry Riser Specialists
Dry Riser Specialists
Gaseous Supression
Gaseous Supression
Gaseous Supression
Watermist
Watermist
Watermist
CAD
CAD
CAD
Accreditation

LPCB 9001

LPS1048

LPS1014

FIA

FPA

Overview
Installation of a New Complete Fire System (Detection and PAVA) at a Train Station.

We installed a state-of-the-art fire alarm system at a train station to comply with local safety regulations and ensure the security of its occupants.

Our team of designers completed the detection and PAVA designs in adherence to the following standards:


  • BS5839-1 and BS5839-8

  • LPCB LPS1014

This comprehensive approach guaranteed compliance with the highest safety standards, ensuring the utmost protection for the station.

M&S Food exterior in Waterloo Station.
M&S Food exterior in Waterloo Station.
Installed fire supression system.
Installed fire supression system.
Challenges Faced
Complex Building Layout:

The building featured a mix of open-plan spaces and enclosed rooms, necessitating a tailored approach to fire detection coverage. Ensuring complete coverage while avoiding false alarms posed a significant challenge.


Short Turnaround for Completion:

There was a tight deadline for the unit to open and start operations, requiring efficient project management.


Integration with Other Systems:

The fire alarm system needed seamless integration with the station-wide fire system and access to control systems. Coordinating with contractors and ensuring interoperability demanded extensive planning and testing.


Operational Disruptions:

Working in a live railway station with high public traffic made minimising disruptions crucial. Work had to be scheduled outside business hours and phased strategically to avoid impacting daily operations.

Collaboration with Stakeholders

Regular coordination meetings with management, contractors, and regulatory bodies (NWR Fire team) streamlined approvals and integration efforts.

Proactive Procurement Strategies

By sourcing from multiple vendors and pre-ordering critical components, we effectively mitigated the impact of supply chain delays. The fire alarm system was successfully installed and commissioned on time, meeting all safety standards.

Its integration with other services was seamless, enhancing overall emergency response capabilities. Our proactive problem-solving approach ensured minimal disruptions, and the project was completed within budget.

Conclusion

This project underscores the importance of flexibility, collaboration, and strategic planning in fire alarm system installations. Overcoming challenges such as regulatory compliance, operational constraints, and supply chain disruptions required innovative solutions and a client-focused approach. The project's success has led to further collaborations with M&S on future safety initiatives.

Certified Excellence in Fire Safety

HAWK FIRE is independently certified under LPCB LPS1014 & LPS1048 standards to design, install, commission and maintain fire detection, alarm systems and sprinkler systems.

HAWK FIRE is your premier choice for comprehensive fire safety solutions.

HAWK FIRE is your premier choice for

comprehensive fire safety solutions.

HAWK FIRE is your premier choice for

comprehensive fire safety solutions.

Specialising in design, build and maintenance of a variety of fire safety systems, including: Conventional systems, Analogue fire detection and alarm systems, Networked analogue fire detection and alarm systems, Aspiring detection systems, Automatic sprinkler systems, Hydrant systems, Extinguishing systems, Watermist system. Our expertise ensures that we get it right the first time, everytime.